SHARE SLAM Trial or Rental: How to Choose the Right Option

Trending Searches

Home

/

FAQ

/

Scanning Tips

FAQ / Scanning Tips

SHARE SLAM Trials and Rentals

Direct Answer

A trial helps teams evaluate whether a SHARE SLAM scanner and workflow fit a real project before purchase. A rental supports delivery on a defined project and timeline. For either option, confirm the site scope, candidate model, deliverables, coordinate requirements, acceptance criteria, training, data backup, support, and return responsibilities in writing.

Trials and Rentals Address Different Needs

First determine the project objective.

A trial evaluates before purchase whether handheld simultaneous localization and mapping (SLAM) scanners in the SHARE SLAM line and SHARE PointClouds Studio fit the project. A rental supports a one-off project with a defined period, a short-term capacity increase, or a transition before procurement. Availability and specific terms for the SHARE SLAM S20, SHARE SLAM S20 SE, SHARE SLAM S100, and SHARE3DCAM C10 Series must be confirmed through the official website’s sales channel.

OptionPrimary purposeMust be defined before applying
TrialCompare models, workflows, and delivery fitActual site, acceptance criteria, candidate models, and trial-test checklist
RentalComplete a project within an agreed periodRental period, project scope, accessories, training, delivery, and return responsibilities

s02-trial-rental-lifecycle-en.png

Figure 1: Trials and rentals proceed through application, equipment handover, training, project execution, data archiving, and equipment return.

What Should Be Submitted With the Application?

  • Project type, area, floors, indoor/outdoor scope, and on-site risks;
  • Candidate model—SHARE SLAM S20, SHARE SLAM S20 SE, SHARE SLAM S100, or the SHARE3DCAM C10 Series—and the reason for selecting it;
  • Target deliverables: point cloud, inspection reports, drawing exchange format (DXF) files, downstream computer-aided design (CAD) or building information modeling (BIM), or 3D Gaussian splatting (3DGS) viewing;
  • Coordinate conditions: relative coordinates, project coordinates, real-time kinematic (RTK) positioning, control points, or external post-processed kinematic (PPK) data;
  • Workstation configuration, target software and version, and operator experience;
  • Project tolerances, acceptance baseline, independent check points, and customer acceptance representative. Deposits, fees, inventory, and delivery dates are dynamic commercial information. They should be documented in a formal confirmation or agreement rather than quoted from historical prices on this content page.

How Should Device, Software, and Training Scope Be Listed?

ScopeItems requiring written confirmation
EquipmentMain unit model, serial status, batteries, charger, memory card, and other accessories
SoftwareSHARE PointClouds Studio version, login requirements, update arrangements, and support scope
TrainingOn-site capture, data copy, project management, reconstruction, registration, coordinates, checks, and export
  1. Data backup: Copy the original project from the TF card to local storage in full without changing directories or filenames. Retain at least the original data, project, and key deliverables.
  2. Project archiving: Retain the complete project directory, version records, coordinate records, inspection reports, and agreed deliverables according to the data-management agreement. The verified CAD export ZIP is reserved for the package containing both DXF and DWG files.
  3. Equipment return: Both parties confirm inspection, inventory, and condition records. Conditions beyond normal use are handled according to the agreement.
  4. Data disposition: Follow and document the agreement regarding data ownership, retention period, permitted use, and memory-card erasure.

How Are Failed Tasks and After-Sales Support Handled?

Task management records successful, failed, and canceled states; failed or canceled tasks can be retried.

If original data cannot be added, reconstruction stops, the trajectory is abnormal, or registration/coordinates shift as a whole, do not repeatedly modify the source data. Record the affected stage and software/workstation environment, and retain the original data, project, deliverables, and logs. Login is required to upload logs; include a contact and issue description for technical-support analysis.

Frequently Asked Questions

Q: What is the difference between a trial and a rental? A trial is for procurement validation; a rental is for project execution during a defined period. Both require scenario, delivery, and acceptance checklists, while a rental must additionally define equipment-return and data-disposition responsibilities.

Q: Can SHARE SLAM S20, SHARE SLAM S20 SE, SHARE SLAM S100, and the SHARE3DCAM C10 Series be compared during a trial? You can request candidate models and same-scenario comparisons. Actual model availability, configurations, and arrangements must be confirmed through the official sales channel. Use the same route and acceptance criteria for comparison.

Q: What if processing fails during the rental? First retain the complete data and project, review the task state in task management, and retry according to support guidance. When analysis is needed, submit logs, environment details, an issue description, and relevant deliverables.

Q: Can CAD or BIM delivery be agreed for a rental project? Downstream service responsibilities can be agreed, but SHARE PointClouds Studio’s current standard CAD deliverable is DXF and DWG files in the exported ZIP package, which requires manual review. Professional CAD personnel must review and edit the exported DXF and DWG files. RVT, IFC, complete BIM models, and SketchUp deliverables require downstream professional workflows, and the relevant acceptance criteria must be agreed separately.

Q: Which files should be backed up before returning the equipment? At minimum, back up the original data, project directory, point-cloud deliverables, _registered.las/_converted.las, inspection reports, necessary logs, and the CAD export ZIP package containing both DXF and DWG files. Handle memory-card data according to the agreement.

We use cookies to understand how users interact with our website
This website uses cookies to provide and improve user experience. For more details on how we use cookies and how to adjust your cookie settings, please refer to our Cookie PolicyCookie Policy
Accept
Decline
取消
热门搜索: